Stage-specific construction evidence

Explore the dedicated Stage 25 case study.

This page records the wider Stages 21–25 development. The dedicated Stage 25 case study documents the 1,380m² retaining package, deep sewer interface and purpose-built rock drilling tooling.

Review Stage 25 scope, constraints and construction photographs ↗

The Stage 25 dimensions relate to that stage only.

Stonehill Stages 21–25Property developmentConcrete sleepersSteel posts
The project

Retaining walls built around changing site levels.

Outwest Retaining Walls’ work at Stonehill Stages 21–25 includes concrete sleeper retaining walls supported by steel posts.

The site photographs show retaining wall runs beside developing roads and across changes in ground level. Taller and lower sections step along the site, with concrete sleepers held between steel posts.

Project photographs

Stonehill Stages 21–25 on site.

Let’s talk about your site

Make your next move
on solid ground.

Send your plans, photographs and site address. We’ll discuss the retaining wall and excavation requirements for your project.