Concrete Sleeper Wall Replacement in Leopold
An approximately 18m charcoal concrete sleeper wall, built 1.2m high, replacing a failing timber wall and incorporating concrete steps completed by Outwest.

- Total wall length
- ≈18m
- Wall height
- 1.2m
- Charcoal concrete sleepers
- 80mm
- Steel posts
- 100UC15
Replace the failing timber wall and connect the levels.
The existing timber retaining wall was falling over. Outwest removed it and installed a charcoal concrete sleeper replacement for the private homeowner.
A step opening and concrete steps were included, with the steps completed by Outwest to provide a transition between the outdoor levels.
Charcoal sleepers, steel posts and concrete steps.
- Alignment: Approximately 18m long, built 1.2m high.
- Sleepers: 2m-long, 80mm-thick charcoal concrete sleepers.
- Posts: 100UC15 steel.
- Associated works: Existing timber wall removal and concrete steps.
Project photograph: replacement charcoal concrete sleeper wall and concrete steps at the Leopold property.
Start with your site and the space you need.
Send your location, wall length and heights, photographs, available plans and access restrictions so we can review the scope.